Cost the work with positions, works and rates

The works on a bill of materials are what people and machines do to the materials. Each work has a cost, so a product’s cost includes labor and machine time and not only what you bought.

All in Settings, under Operations:

  • Positions: a worker role, such as Candlemaker or Joiner, with an Hourly rate. This is the rate every specification step on that position is costed at. You can cost a product before you know who will make it, and the cost does not move every time you hire someone. A position with no rate shows No rate on a specification line.
  • Works catalog: predefined works with a cost basis, such as Assembly, Sanding or Coating. Picking one on a step fills in its cost basis and rate.
  • Resources: a machine, a table or a room, with an Hourly rate for machine time and a capacity. Leave electricity out of the rate, because it is already in overhead. A table or a room usually has no rate.
  1. Open the bill of materials in Production → Bill of Materials and go to Works.
  2. Click Add operation.
  3. Under Work source, choose From catalog and pick a work, or Own work and name it.
  4. Choose the Cost basis:
    • Hourly: costed at a Position’s hourly rate. The rate is never typed on the step.
    • Flat hourly: a rate typed on the step, with no position or contractor named.
    • Piece-rate: a price per unit. The labor for one batch is the Piece rate times the Units per batch.
    • Outsourced: a Fixed sum agreed with a Contractor.
  5. Enter the Hours (or the units), and choose whether quantities are stated Per batch or Per unit.
  6. Optionally choose a Machine.

The Line cost shows what the step contributes. A step with no rate says No rate, and the specification’s total is marked incomplete rather than treating the step as free.

Two rates answer two questions:

  • The position’s rate answers “what does this job cost?”. It prices every specification, every price built on cost, and the estimate for a production order with nobody assigned.
  • The employee’s rate answers “what did this actually cost?”. When you assign a person to a step on a production order, their rate is copied onto that line and frozen there. That frozen rate is what the finished batch is costed at.

On each step you can also set:

  • Counts toward employee pay: logged labor accrues to the assigned employee’s payroll. It changes pay only. Product cost includes the labor either way.
  • Needs a quality check: finishing the step on a production order opens a check. It never blocks the work.
  • Consumes no labor: for drying, curing or setting. See Count drying and curing time without paying for it.